No checklist can make an installed curtain hurricane-proof. The goal is to reduce avoidable load and prevent predictable damage without creating new hazards.

Furl or Reef the Skirt Only with a Suitable System

Raising the skirt reduces the area exposed to current and can help prevent ballast from snagging as water levels change. Use purpose-built reefing lines where available and keep the furled material compact, evenly supported and clear of propellers.

Do not improvise a few tight ties that create point loads, cut the fabric or allow the chain to swing freely.

Protect Anchors and Load Distribution

Inspect every curtain attachment, bridle and line. Correct chafe points and confirm hardware closure. Where a qualified designer calls for added or repositioned anchors, the complete arrangement must account for bottom conditions, changing water level, directional loading and safe retrieval. Adding a heavy anchor to an inadequate attachment point can simply move the failure to the curtain, cable or connector.

Reduce Contact and Debris Exposure

Move stored lumber, pipe, pallets, loose dock materials and construction waste away from the water before the storm. NOAA recommends moving loose items indoors or tightly securing items that cannot be moved to reduce storm-generated marine debris. At the curtain, use approved separators or stand-offs where ordinary contact with pilings is expected, but do not assume they can absorb vessel or large-debris impact.

Maintain Visibility and Navigation Coordination

Marker buoys and lights can help identify the barrier before and after the storm, subject to local requirements and the risk that they themselves become debris. Coordinate with the project owner, harbormaster, Coast Guard or other authority when a displaced curtain could obstruct navigation. Record the installed location and section count before evacuation so missing equipment can be identified later.

Prevent Overtopping and Submergence

Overtopping is not solved by tightening anchor lines until the boom is rigid. Excessive downward line load can pull flotation under as water rises or waves pass. Verify freeboard, float condition and anchor-line geometry. Any adjustment must preserve the curtain’s ability to follow the water surface within the intended range.

Do not create a false sense of security!

Extra anchors, heavier chain, larger floats, dual cables or a Type 3 label may be appropriate components of a demanding installation. None should be marketed or treated as a stand-alone hurricane guarantee.

Share This Story, Choose Your Platform!

Case Study: Sediment Control for Canal Dredging in Jupiter, FL

Client Dredging Contractor – Jupiter, FL Industry Dredging & Marine Construction Location Jupiter, Florida Project Overview A dredging contractor in Jupiter, FL was tasked with improving hydraulic flow in a canal that supports both recreational and commercial use. During the [...]

Case Study: Sediment Control Along the Delaware River

Client Construction Contractor – Philadelphia, PA Industry Construction, Environmental Protection Location Delaware River, Philadelphia, PA Project Overview During a construction project along the Delaware River, contractors needed to manage contaminated soils disturbed within the work area. Uncontrolled sediment migration risked [...]

Case Study: Connecticut State Pier Infrastructure Improvements for Kiewit

Case Study: Connecticut State Pier Infrastructure Improvements Client Kiewit Infrastructure Co. (Construction Manager-at-Risk) Industry Marine Construction, Renewable Energy Infrastructure Location New London, Connecticut Project Overview The Connecticut State Pier Infrastructure Improvements Project (CTSP) is a landmark redevelopment designed to transform [...]

related news & insights.

    Go to Top